Fuel Kiosk · One Twin Dispenser
One Wayne cabinet with two hoses: Side A = Premium on channel 1, Side B = Diesel on channel 2. Each side has its own motor, handle switch, and pulser. This uses the control box you already have. The box is built with only two relays, two contactors, and two motor breakers.
Side A — Premium
Pulser TB3-1 / TB3-2 → PLC X1 · Enable Y1 → RLY1
MCB1 → CON1 → motor TB5-1/2/3 · Coil fuse FU2 · Pulser fuse FU10
Kiosk command 1
Side B — Diesel
Pulser TB3-3 / TB3-4 → PLC X2 · Enable Y2 → RLY2
MCB2 → CON2 → motor TB5-4/5/6 · Coil fuse FU3 · Pulser fuse FU11
Kiosk command 2
Lock out and verify dead
Turn off the dispenser breaker and both field disconnects. Lock and tag them. Use your meter to check for zero volts at TB1 and at the Wayne cabinet junction box.
Fit only two channels in the box
The box needs two relays (RLY1/RLY2), two contactors (CON1/CON2), two motor breakers (MCB1/MCB2), two coil fuses (FU2/FU3) and two pulser fuses (FU10/FU11). If a third or fourth set is already mounted, disconnect it and take it out to free up the rail.
Run conduit to the Wayne cabinet
Both sides are in one cabinet, so one power conduit carries both motor circuits (a separate 12AWG black/white/green set for each side), and a second conduit carries the two pulser shielded pairs. Put an EYS seal at the cabinet entry, plus another within 18" of the island if your inspector requires it.
Wire the motors through the handle switch
CON1 T1 → TB5-1 → Side A handle (hook) switch → motor HOT. Neutral TB5-2 → motor, ground TB5-3 → dispenser frame. Do the same for Side B on TB5-4/5/6. The motor only runs when the PLC has armed it AND the nozzle is lifted.
Mount the pulsers
Bolt one pulser to each of the two mechanical register drives inside the cabinet. Land the signal on TB3-1 (A) / TB3-3 (B) and the return on 0V. Ground the shield at the panel end only, and keep the pulser cable away from motor wires.
Set the motor breakers
Read the FLA off both motor nameplates inside the cabinet. Set MCB1/MCB2 to that FLA (no higher than 1.15× FLA). If either motor runs on 240V, call before you wire it: CON L2/T2 would be needed.
Check the 24V side
With 120V still off, power the 24V supply only. Press the E-stop → TB7-4 should drop to 0V. Lift each float → it should also drop. Confirm X7 is ON with both contactors open.
Dry test (no fuel)
Run a demo session on the kiosk. Y1 should pull in RLY1 and CON1 for Premium, and Y2 → CON2 for Diesel. Hit stop and confirm both contactors drop out.
Calibrate with the proving can
Pump 5 gallons from each side into the certified can and read the pulse count off the PLC. Pulses ÷ 5 = pulses per gallon. Send me both numbers so I can put them in the system.
Label and close up
Label every wire at both ends with its tag from the table. Put red tape on each black DC conductor. Close the box and test live once with a small paid sale.